Portfolio case study · Custom manufacturing

AI-enhanced quoting, priced by the numbers, not by hunch.

Estimators describe the job; the system returns a complexity score, a calibrated price band, and the reasoning behind it — logged for every prediction, on every quote, against your industry's benchmark.

One-click Sign in as demo— no account needed. Loads with 11 realistic seeded quotes.

msi-quote-studio.vercel.app/quotes/W8tk…

AI Analysis

Boeing 787 cabin nameplate run · 2,400 pcs

Accepted
Complexity score8/10

Suggested price range

$2,640$3,150

Rationale

Complexity 8/10 reflects Aerospace certification requirements (AS9100, ITAR) and the 2,400-piece run size. Required certifications drive documentation overhead. Suggested band reflects standard markup plus a premium risk allowance.

llama-3.3-70b-versatile · 1.4s · prediction logged

Modelled on real catalog data from 8 manufacturing verticals

Aerospace
Medical
Defense
Oil & Gas
Telecom
Food & Bev
Marine
Industrial

How it works

From job description to sent quote in under 90 seconds.

Four steps. The AI scoring and benchmark deltas happen on every quote, automatically, so the estimator never opens another spreadsheet.

  1. 01

    Describe the job

    Pick a product, material and industry. Set dimensions and run size. The catalog comes pre-loaded with the standard Marking Systems product list.

  2. 02

    AI scores complexity

    Real Groq inference returns a 1–10 complexity score, a calibrated price band, and a plain-English rationale. Every prediction logs to an audit table.

  3. 03

    Review against benchmark

    See your cost structure beside your industry's benchmark. Materials, Labor, Overhead, Scrap — green and red deltas tell you where margin hides.

  4. 04

    Send a branded quote

    Mark sent. Customer approves with one click. Track through your pipeline as it moves from draft to accepted to invoiced.

Try it now — free

Manufacturing cost calculator.

Drag the sliders to see your unit cost, monthly total, profit per unit, and gross margin update live. No sign-up — bookmark the page if you want to come back to it.

Free tool · No sign-up

Manufacturing cost calculator

Drag the sliders. The unit cost, monthly total, and profit margin update live.

Material cost per unit$25
5120
Labor hourly rate$28/hr
1580
Labor hours per unit1.5 hrs
0.16
Monthly volume5,000 units
10050,000
Selling price per unit$150
20500

Cost per unit

$81.74

materials + labor + overhead + scrap

Monthly total cost

$408,700

5,000 units / month

Profit per unit

$68.26

at $150 sell price

Gross margin

45.5%

above industry baseline (25–35%)

Cost structure breakdown

Materials 30.6%Labor 51.4%Overhead 14.8%Scrap 3.3%

Want this on every quote, with AI complexity scoring and your industry's benchmark deltas?

Get it on every quote

Benchmark

Stop guessing where your margin hides.

Every quote shows your cost structure next to the industry benchmark. Materials at 48%? Labor 30%? Scrap 6%? The deltas tell you where the lever is, in seconds. No spreadsheets, no outside consultants.

  • Pulled from publicly available manufacturing-cost benchmarks.
  • Scoped to your industry, your product category, your run size.
  • Updated as your quote pipeline grows.

Live preview

Your numbers vs industry benchmark

Industry
CategoryYours · IndustryΔ
Materials
31% · 48%
17.0
Labor
52% · 28%
+24.0
Overhead
11% · 18%
7.0
Scrap
6% · 6%
0.0

Synthetic preview. Sign in to see real benchmark deltas on your quotes.

Get my benchmark

How estimators describe it

Three roles, three different reasons it lands.

Synthetic quotes attributed to representative manufacturing personas. Demo project, not a customer endorsement.

The AI rationale on every quote is the part I didn't know I needed. We finally have a paper trail when a customer disputes a price.

VP Operations

Aerospace components manufacturer

I quote 40 jobs a week. The benchmark widget shaved 15 minutes per quote and surfaced two product lines we were under-pricing by 8%.

Senior Estimator

Medical device labels

The dashboard tells me where in the funnel quotes die. Last quarter I caught a 12% drop in conversion on aluminium parts before my GM did.

Plant Manager

Industrial OEM

Frequently asked

The questions estimators usually ask.

Cost methodology, AI scoring details, scrap recovery math, margin benchmarks. Plain answers, no marketing fluff.

Try it now

Sign in as demo, land in the app in five seconds.

Pre-seeded estimator account, 11 realistic quotes across Aerospace, Medical, Defense and Industrial verticals, real Groq AI on every quote.